深圳污水主干管渠及泵站工程设计优化
- 由页
-
54 次阅读
-
0 次下载
-
2019-03-21 23:33:44
文档简介:
深圳污水主干管渠及泵站工程设计优化彭书郁(深圳市市政设计研究院,深圳518035)摘要介绍深圳长20.5km的污水主干管渠和滨河泵站(10万m3/d),新洲泵站(10万m3/d),凤塘泵站(38万m3/d)的工程设计优化情况。主干管渠设计中注意了控制埋深,避开填海区,缩短压力管,污水截流管离开沿河岸区,管道与河道相交的做法以及运用顶管施工技术等。提升泵站采用潜水泵,取消压榨机,外观美化等措施。工程竣工数年,运行良好。关键词污水主干管渠提升泵站优化深圳市OptimizeddesignofsewermainandpumpingstationsinShenzhenPengShu—yu(MunicipalEngineeringDesignandResearchInstitute,Shenzhen518035,China)Abstract:Themajorizeddesignsofasewermainpipeandcanal(totaldistance20.5km)andthreepumpingstationsnamelyBinhe(capacity10×104m3/d),Xinzhou(capacity10×104m3/d)andFengtang(capacity38X104m3/d)inShenzhenaredescribed.Inthesewermainpipeandcanaldesign,problemslikecontroloflayingdepth,avoidanceoflayoutinareaofseareclamationorriversidealongandcutdownthedistanceofpressurizedlineweretakenintoconsideration.Besidethesealsomeasuresofpipecrossingriverandthepipepushingconstructionwereproposed.Submergedpumpassemblieswereadoptedfortheboostingpumpingstationswithdecoratedarchitecturedesignandtheslagpresswasignored.Thisprojecthasbeenoperatingforyearsnorma
评论
发表评论